ConflictHighReportedAccelerating
7.1
Telegraph links Leipzig airport sabotage to GRU unit tied to Skripal poisoning
Meduza English·DE · RU · GB·about 22 hours ago
Cost estimates for the government airport extension at Berlin-Brandenburg (BER) have surged from €340M to as much as €2.5B, an eightfold increase. The cause of the overrun is not yet specified, and the figure remains a report-level claim pending official confirmation. This adds to BER's history of major cost overruns and delays, raising fiscal and political concerns in Germany.
Locations
Entities