InfrastructureNotableEmergingDeveloping
5.4
Bogotá Metro Line 2 pre-qualification advances; bids due by year-end
La RepúblicaLO·CO·3 days ago
Demolition of the vehicle bridge at Séptima with 100 in Bogotá begins, part of a project to build a wider bridge and depressed crossings for mixed transport. The change will alter local traffic patterns during construction. The development is routine urban infrastructure work with no broader geopolitical or market implications.
Locations
Entities