InfrastructureNotableConfirmedDeveloping
10.0
Chilean concessionaires association cautions against expectations for 30% TAG rate reduction
BioBío ChileLO·CL·2 days ago
Ingelog Consultores has commenced riverbed surveys in the Valdivia River to finalize the structural design and placement of the Cochrane Bridge. This phase is necessary to determine the precise positioning of piers and abutments for the future crossing.